Operation Army Truck, Part 3
|
With all the tubes cut and tacked in place, Hanna moved onto installing the three supports between the round and rectangular tube. He also added some plates to the bottoms of the hangers, but drilled holes to keep water and mud from collecting inside. Then it was time for a coat of paint before the final install. View Related Article
|
|