Installing an Oil Accumulator
|
With the valve open, the Accumulator is pressurized to 60 psi with compressed air. This is done to move the floating piston to the empty position. The pressure is bled down to 6 psi and the engine is started. The Accumulator will fill up and build pressure. View Related Article
|
|