Project 1974 Chevy K5 Blazer - Exterior Build - Building A Premudder
With the front buttoned up, we started with the cage. Tubing was measured, cut, and notched with a holesaw fixture. Fabworx had ordered a variety of 1-, 1 1/4-, 1 1/2-, and 1 3/4-inch tubing from Team Tube to build the rollcage and suspension with. View Related Article
|
|